Provided resident engineering
and field inspection services for this 424’ long by 42’ wide, 5-span,
low water crossing bridge project.
The new bridge is a precast, prestressed, concrete "I"
girder structure supported by 5' diameter cast-in-steel-shell concrete
piles.
Client:
Santa Cruz County
Cost:
$4,131,362
Public Works
Department
Project Completion:
June 2005
701 Ocean Street, Room 410
Contractor:
Anderson Pacific Engineering Construction, Inc.
Attn:
Sheldon L. Hicks - Retired
(831)
477-3956